This 1,800-car parking structure exhibited problems with the expansion joints since it was built in 1988.
Ryan Biggs Clark Davis was retained in 1999 to perform annual inspections and design repairs to joints and precast. In 2010, Ryan Biggs | Clark Davis served as the Structural Engineer of Record and Special Inspector for the removal and replacement of the 193,000-square-foot, upper level of this precast parking structure provided by Unistress.
The estimated cost of repairs was $4 million.