This 1,800-car parking structure exhibited problems with the expansion joints since it was built in 1988.
Ryan Biggs | Clark Davis was retained in 1999 to perform annual inspections and design repairs to joints and precast. In 2010, Ryan Biggs | Clark Davis served as the Structural Engineer of Record and Special Inspector for the removal and replacement of the 193,000-square-foot, upper level of this precast parking structure provided by Unistress.
The estimated cost of repairs was $4 million.