Ryan Biggs | Clark Davis provided land surveying and structural engineering services for Design Documents and Construction Administration services for the replacement of three high voltage transformers and associated medium voltage switchgear at the State Office Building Campus’ electrical substation.

The substation is one-story, above-ground masonry shear wall structure with a full basement supported on spread footings. The remaining site has three transformer pads and concrete containment structures as well as an additional angle frame switch support structure. A boundary and topographic survey was completed in the scope of the project. The overall construction cost was estimated to be $12 million.