Ryan Biggs | Clark Davis provided structural design services relating to the emergency stabilization of the Bethlehem Middle School front entrance. The stone cornice at the roof pediment was deteriorated and required repairs after several pieces fell and became a safety concern.
Ryan Biggs | Clark Davis performed site visits and assisted the school district in selecting a Contractor to provide tasks to stabilize potential conditions. The full scope of the repair work was not approved by voters under this referendum.